Now the visible level is laid out with rails. Here too you are put to the test. I have already set up 3 trains and let them run. A little improvement needs to be made here and there. The switches are already programmed. Next, the contact points of the main level and the signals are set and the software is programmed. The rails are then attached and the landscape is built.
The main level
- Details
- Parent Category: Modelling
- Category: Model railway
- Hits: 678