Unfortunately, what I actually wanted to avoid happened happened. Since the heating broke and we were getting a new electricity meter, the system had to be dismantled. A new facility is already planned. It will have a shadow station and a sack station with a through track. The dimensions will be 2.60 mx 1.1m. I was able to buy an ICE 3 at auction. It will be 5 days be.
Shadow station planned:
Sack station with through track planned: