Wednesday 22 January 2025
Last article from: Wednesday, 01 January 2025.

Select your language

Featured

Since I realized that the chimney sweep couldn't get to the chimney because of my model railway system, the system was dismantled. It will not be possible to rebuild it in this position. Since I don't have any space, the things are now well packed and ready to be set up if a good solution is found. There is a plan of what the new facility should look like. It will have three levels with a shadow station, a double-track block line and a sack station. The space requirement is given as 2.60m x 1.30. The trains could be up to 1.80 m long. That's more than before. The track material is all there, the only thing missing is a suitable place. I hope I'll come up with a good solution soon.

Here is the track plan

We use cookies on our website. Some of them are essential for the operation of the site, while others help us to improve this site and the user experience (tracking cookies). You can decide for yourself whether you want to allow cookies or not. Please note that if you reject them, you may not be able to use all the functionalities of the site.